Client system2026

e-SKM — Digital Public Satisfaction Survey

A QR-first satisfaction survey that turns citizen feedback into a regulated IKM score, a service-quality grade, and reports that staff can act on.

Client / context
Kementerian Agama Kota Palembang
Role
Full-stack development
Year
2026
Type
Client system
Abstract editorial cover showing survey bars and a circular satisfaction index for e-SKM.
Illustrative system coverInterface screenshots available on request

Public service units are required to measure citizen satisfaction regularly. At Kementerian Agama Kota Palembang, the process needed to move beyond paper questionnaires and generic forms without losing the rigour required by national regulation.

Paper surveys created friction at the service counter, weighted scoring was rebuilt by hand, and results were not separated by service type.

  • Paper forms added time and friction for visitors, which reduced participation.
  • Weighted IKM scoring across nine service elements was a manual, error-prone recap.
  • Generic questionnaires did not separate results by service, hiding which unit needed attention.
  • Written complaints were often reviewed only at the end of a reporting period.

A responsive survey and admin workspace that validates responses, calculates weighted scores automatically, and publishes results by service and period.

  • QR-code and kiosk access with no account required for respondents.
  • A nine-element instrument aligned with Permenpan RB No. 14 of 2017.
  • Automatic NRR, weighted NRR, IKM score, and A–D service-quality grading.
  • Dashboards segmented by service type, demographics, and reporting period.
  • Complaint follow-up tracking, plus PDF and Excel report exports.
  • 01QR and kiosk survey entry
  • 02Nine-element Likert instrument
  • 03Automated IKM calculation
  • 04Service-quality grading
  • 05Demographic segmentation
  • 06Complaint and follow-up register
  • 07Public results summary
  • 08PDF and Excel exports

The system replaces a periodic paper exercise with a continuous evaluation loop. Staff no longer rebuild weighted scores by hand, and leadership can see which service elements are weak while the feedback is still fresh.

Qualitative outcome based on the documented scope. Measured usage or performance metrics are not published.

Scope

  • Survey design
  • Scoring engine
  • Admin dashboard
  • Reporting
  • Public results

Verified technology

A verified stack list is not published for this project. Scope is documented above.

Next step

Let's build something that holds up.

If you are planning a web application, integrating existing systems, or reviewing an application's security, send a short brief with the context that matters.

Location

Palembang, South Sumatra, Indonesia

Focus

Full-stack · Integration · Security

Direct WhatsApp